Leave Your Message

Our lab

Our lab (4)

Inspection Instructions

Our lab (2)

Inspection Instructions

Our lab (5)

Inspection Instructions

Our lab (3)

Inspection Instructions

Our lab (1)

Fatigue Life Testing Machine

Non-conforming product control flow chart

  • site (2)
    Step 1
    Found non-conforming product from inspector of QC
  • site (2)
    Step 2
    Well collected all goods of full batch size & report to QC manage
  • site (2)
    Step 3
    Transfer non-confirming products to special area
  • site (2)
    Step 4
    QA &QC checking again for final confirmation / method
  • site (2)
    Step 5
    Process goods with confirmed method to solve quality issue
  • Step 6
    Focus on the batch & Final inspection by both of QC & QA

PROCESS FLOW DIAGRAM OF STEEL GRIT

  • site (2)
    Step 1
    Waste Steel 
  • site (2)
    Step 2
    Melting
  • site (2)
    Step 3
    Centrifugal Shaping
  • site (2)
    Step 4
    Dying & Rust Cleaning
  • site (2)
    Step 5
    Screening
  • site (2)
    Step 6
    Crushing
  • site (2)
    Step 7
    Screening
  • site (2)
    Step 8
    Tempering 
  • site (2)
    Step 9
    Refined Screening 
  • project_arr
    Step 10
    Packing

PROCESS FLOW DIAGRAM OF STEEL SHOT

  • site (2)
    Step 1
    Waste Steel 
  • site (2)
    Step 2
    Melting
  • site (2)
    Step 3
    Centrifugal Shaping
  • site (2)
    Step 4
    Dying & Rust Cleaning
  • site (2)
    Step 5
    Screening
  • site (2)
    Step 6
    Tempering
  • site (2)
    Step 7
    Refined Screening
  • project_arr
    Step 8
    Packing